Termine
Jetzt anfragen!
Niveau:
Fortgeschritten
Kontakt
- WS Akademie partner of Railway Systems
- Heidemarie Sieder
- + 43 664 8561420
- Nachricht senden
The seminar conveys the principles of what optimization options are available from the planning
the design of components through to maintenance and servicing. After an introduction to the
individual components of a turnout, it is first shown how negative effects on time and costs can
be avoided as early as the planning phase.
Furthermore, the latest developments in switch design with regard to optimized installation. Finally,
modern diagnostic and monitoring systems are presented and it is shown how they can be used
in combination with asset management optimize maintenance and repair intervals.
Course Content
- Basics of turnout design and components
- Planning: principles to avoid increased follow-up costs
- Optimized switch components for installation and replacement
- Monitoring and asset management systems for time-optimized maintenance and servicing
Target Group
Course for planners, installers and maintainers of switch systems, project managers and project staff, railroad engineers and engineers in the infrastructure industry.
Trainer | Dipl.-Ing. Robert Demal |
Date | on request |
Price | on request |