Smart turnout design for time-optimized installation solutions

Daty

Wniosek teraz!
Poziom: Zaawansowany

Kontakt

The seminar conveys the principles of what optimization options are available from the planning the design of components through to maintenance and servicing. After an introduction to the individual components of a turnout, it is first shown how negative effects on time and costs can be avoided as early as the planning phase. Furthermore, the latest developments in switch design with regard to optimized installation. Finally, modern diagnostic and monitoring systems are presented and it is shown how they can be used in combination with asset management optimize maintenance and repair intervals.

Course Content

  • Basics of turnout design and components
  • Planning: principles to avoid increased follow-up costs
  • Optimized switch components for installation and replacement
  • Monitoring and asset management systems for time-optimized maintenance and servicing

Target Group

Course for planners, installers and maintainers of switch systems, project managers and project staff, railroad engineers and engineers in the infrastructure industry.

 

Trainer Dipl.-Ing. Robert Demal
Date on request
Price on request