Rammed piles
- In stable soil
- Fast installation: > 250 piles / day per machine
- Optimal accessibility for maintenance
- Limited number of components - no accessories
- Very cost-effective
Concrete foundations
- For unstable soil (for example, landfill)
- Good alternative if pile-driving is not possible
- Adjustable after the soil has settled
- Poured on site or with prefab concrete blocks
Screwed piles
- For very unstable or rocky soil
- Suitable for landfills with limited penetration depth
- Fast installation: > 200 screws / day per machine