RWE Power AG / BoA 2&3 in Neurath

2016-08-25 | 

The two 1.100MW lignite-fired units (Block F and G), also known as BoA 2 and 3 (Braunkohlekraftwerk mit optimierter Anlagentechnik), were built in 2012 which is the most modern of its kind in the world. The new units were engineered and constructed by Alstom, Hitachi Power Europe and GEA and have a net efficiency of approx. 45%.

The two 1.100MW lignite-fired units (Block F and G), also known as BoA 2 and 3 (Braunkohlekraftwerk mit optimierter Anlagentechnik), were built in 2012 which is the most modern of its kind in the world. The new units were engineered and constructed by Alstom, Hitachi Power Europe and GEA and have a net efficiency of approx. 45%. 

 

Year

2008-2011

Country of installation

Germany, Grevenbroich-Neurath 

Industry Segment

Power generation /  Thermal power 

Components

Various boiler components (e.g. superheaters, reheaters, headers) 

 

Products

  • THERMANIT CHROMO 9 V
  • MARATHON 543
  • THERMANIT P 24
  • UNION I P24
  • UNION S P 24
  • THERMANIT MTS 3
  • THERMANIT MTS 616
  • UV 305
  • BÖHLER BB 305
  • BÖHLER BB 910
  • BÖHLER FOX C 9 MV
  • BÖHLER FOX P 92
  • BÖHLER P 24-UP
  • BÖHLER C 9 MV-IG
  • BÖHLER C 9 MV-UP
  • BÖHLER P 92-IG