![Shift2Rail Partnership with voestalpine Railway Systems](https://cdnstorevoestalpine.blob.core.windows.net/image-container/786248/Open_CMS_Section/partner-shift2rail-1.jpg)
Shift2Rail基础设施创新计划的成本效益和稳定的高容量通过以下方式实现
- 提升轨道的运行性能
- 建立综合测量和监测系统
- 开发智能资产管理战略
作为技术引领者的奥钢联是积极的贡献者,是奥地利虚拟汽车联盟+的成员,并通过VVAC+作为代表加入Shift2Rail管理委员会。
EU project “Shift2Rail” - Making railway transport more competitive
In October 2020, voestalpine supplied the ÖBB with two demonstrator turnouts for the EU project “Shift2Rail”. The new high-performance turnouts will reduce downtime and lower costs over the entire life cycle.
In close collaboration with partners ÖBB-Infrastruktur and Getzner Werkstoffe, voestalpine Railway Systems developed a system turnout with innovative features in the areas of frogs, switch rails, mounting system, drive unit, and sleepers. The system is constantly monitored using proven technology and a new innovative sensor and measuring concept. Read more about this project here.
![](/railway-systems/static/sites/railway-systems/.images/IMG_8788.JPG_1399675601.jpg)
![](/railway-systems/static/sites/railway-systems/.images/Shift2rail_web_beitragsbild2.gif_1399675601.gif)
![](/railway-systems/static/sites/railway-systems/.images/Shift2rail_web_beitragsbild.gif_1399675601.gif)
![](/railway-systems/static/sites/railway-systems/.images/Shift2rail_web_beitragsbild3.gif_1399675601.gif)
![Partner EU](https://cdnstorevoestalpine.blob.core.windows.net/image-container/786258/Open_CMS_Image_Slider/partner-EU.jpg)
![Shift2Rail](https://cdnstorevoestalpine.blob.core.windows.net/image-container/793908/Open_CMS_Image_Slider/shift2rail_903x510px.jpg)