

Project Launch
September 2012 (First Training) in Switzerland
First installation HYDROSTAR:
April 2013
Project status:
4 turnouts in full operation since July 2013
Project Overview
43 turnouts:
- 10 turnouts on slab track, 33 on ballasted track
- 2 perspective turnouts
- 8 different geometries
- Setting levels: 168 ZV, 60 HB, 168 IE 2010
Installation locations: north, south and 2 mfs inside the tunnel