
Project Launch
2006, in Depot Hüslimatt, Basel-Oberwil
Project Status:
Since 2008 the system is working completely failure-free.
Project Overview
- 16 ea electrical switch machines CSV 24
- 1 ea manual switch machine CSV 34
- Control system TCS 300
- 1 central control station with TCS Visio
- Unilight LED signals and matrix signals
- Route request panels have been installed in the depot