Project Launch
- Autumn 2009 in Austria
Project Overview
voestalpine has equipped about 5000 points in OEBBs network with the points monitoring system ROADMASTER® and therefore contributes to significantly increase the availability of the railway line.
- 103 Signal boxes
- 3299 Turnouts
- 3315 Point machines light
- 6 Point machines advanced
Route sections:
Finished 2009/2010:
- Brenner route
Finished 2010/2011:
- Westbahn route
- Region South - phase 1
Finished 2011/2012:
- Wels - Passau
- Region South - phase 2
- Südbahn (Vienna South - Mürzzuschlag)
Finished 2012/2013:
- Region South - phase 3
- Vienna Metzleinsdorf