To ensure the most efficient progress of construction works, we consider all customer requirements in advance, when the shop drawing is established. The version with satellite pictures is a novelty though already standard at voestalpine.
After the plausibility check, all data are processed and the rails bent within admissible tolerances by means of a fully automatic high-performance machine.
We issue measuring protocols according to our 2-step measuring system (depth gauge and bowstring measurements). Then rails are ready for delivery, if required also “just-in-time” to the construction site.