Project Launch
- April 2008 in Austria
- Duration: 9 months
Project Overview
Overall Length:
- Section Wienerwald: 14,4 km
- Tunnel: 13,3 km
16 Turnouts:
- 1 crossing 1:9
- 7x 2600/1600-1:24 HBS-HB (FF)
- 5x 1200-1:18,5 HBS-HB
- 4x 500-1:12 HBS-HB
Turnouts are situated on ballastless track and mounted on spring systems.