greentec steel: building progress above and below ground
At voestalpine, we are building bridges and tunnels as part of greentec steel, our program for the conversion to steel production with net zero CO2-emissions. The new 800 meter-long conveyor belt bridge that will also supply the electric arc furnace with raw materials from 2027 onwards was recently completed.
- 3